Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

May 25, 2021     33-6 Baggage Area step 7 Inspection panels - (6 hours)       Category: Fuselage
Installation of Inspection Panels in the baggage floor to inspect the entry step and to facilitate routing of electrical cables and antennas. Positioned reinforcement plate to determine position of the hole. Matchdrilled with #40 drill for flush rivts. Cut the hole and filed to measure. Countersunk nutplates rivet holes on the reinforcement plate. Countersunk all the holes for riveting to the floor panel. Tried to dimple but not very happy with the result. Much better with careful countersinking (backing plate to avoid drill wandering and oval holes). Backing plate was already primed therefore i riveted all nutplates.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.